Кипр

Statement from Minister of Interior Öztürkler about infrastructure works for rural land plots

Interior Minister Ziya Öztürkler made a statement about the infrastructure works carried out in rural areas this year.

In his written statement on the subject, Öztürkler said, «We are trying to complete the missing and needed infrastructures in the rural land plots, which were previously given, within the framework of a certain program, in line with our promise to provide services to one village every week.»

Öztürkler said, “As of January, in 8 different villages; As a result of the electrical infrastructure works we have carried out in Aygün, Gaziköy, Köprülü, Alaniçi, Paşaköy, Vadili, Yenierenköy and Arslanköy, electric current has been connected to 32 households, eliminating the grievances of our citizens who have started or completed construction on rural plots with a lack of infrastructure before.

Minister Öztürkler said, “Again, in our two different villages, the water infrastructures have been completed on 46 parcels that have completed their residences and on our 56 rural land plots,” Minister Öztürkler said that they continue to serve in line with the targets they set, and that the asphalt road infrastructure leading to 45 parcels in the rural land plots in Bostancı, which was given 15 years ago, is the first of this year. stated that it was completed in

Explaining that, as a result of the examination carried out by the Housing Unit in 31 different villages, the technical teams determined the infrastructure needs of the previously residential rural land plots and that the feasibility studies were completed in 31 different villages, Öztürkler said, “We will continue to work with the aim of ensuring that there is no missing infrastructure in the rural land plots that have completed their construction in 2023. We will,” he said.



This news has been translated by google translate.

Source Link: BRTK/CNN

ACM Cyprus

ACM Cyprus

Esta Construction

Pools Plus Cyprus

Artificial intelligence has reinterpreted this news for you.

The Interior Minister of Turkey, Ziya Öztürkler, has announced progress on the government’s promise to provide infrastructure to rural areas. In a statement, Öztürkler said his ministry had completed electrical connections to 32 homes in eight different villages since January, while two other villages saw water infrastructures installed on 46 completed parcels of land. Additionally, a road leading to 45 parcels in a rural area given over 15 years ago has been completed. The government intends to eliminate infrastructure deficits in all rural areas with completed construction projects in 2023.

Related Articles

Добавить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *

Back to top button